JobSnap vs ClockShark: Two Time Trackers Built for the Field
ClockShark and JobSnap are closer cousins than most pairings — both were designed for field crews rather than office workers. The differences come down to pricing structure, equipment tracking, and where each product puts its focus.
Competitor information is based on publicly available material and may change — always confirm details and current pricing on the vendor's own site. We've tried to be fair: both products below are capable tools, and the right choice depends on your business.
| JobSnap | ClockShark | |
|---|---|---|
| Pricing structure | $5 per employee/month, $20 minimum. One plan, everything included. | Monthly base fee plus per-user pricing; features vary by plan. |
| GPS & geofencing | Included — punches verified against jobsite boundaries, exceptions flagged for review. | GPS tracking and geofencing available. |
| Equipment tracking | Included — machine hours per job, beside labour hours. | Focused on employee time; equipment is not a core feature. |
| Photos & receipts | Included — attached to jobs and daily timesheets. | Photo attachments supported. |
| Scheduling | Crew and shift scheduling included. | Scheduling included. |
| QuickBooks integration | Yes. | Yes. |
| French & English | Bilingual — built for Canadian crews, including Quebec. | Primarily English. |
| Free trial | 30 days, no credit card required. | Trial available. |
The pricing difference, concretely
Base-fee pricing punishes small crews: with a base fee plus per-user charge, a 5-person crew pays a much higher effective rate per worker than a 50-person company. JobSnap's flat $5 per employee (minimum $20) means a 5-person crew pays $25/month — and the price scales linearly as you grow. No tier upgrades to unlock features you already need.
Where ClockShark shines
ClockShark is a mature product with a large US customer base. If your crews work in the US and already know it, it's a legitimate choice.
Where JobSnap shines
One app for the whole field operation — hours, location, equipment, photos, receipts — with bilingual support for Canadian crews and a single all-inclusive price. Kiosk mode turns any phone or tablet into a shared time clock at the shop door or in the trailer, at no extra cost. Try it against your current setup in the live demo, or run the numbers for your crew size.
Try JobSnap free for 30 days
$5 per employee per month, $20 minimum. Every feature included. No credit card to start.