Free Construction Timesheet Template

A clean weekly timesheet built for construction crews: one row per day, columns for the job or site, start and end times, breaks, regular and overtime hours — with totals that calculate themselves in Excel. Free to download and use, no signup required.

What's in the template

  • Employee and week header — company, employee name, trade or ID, supervisor, hourly rate, and week starting date.
  • One row per day, Monday to Sunday — date, job or site, start time, end time, and break minutes.
  • Regular, overtime, and total hours — daily totals and weekly sums calculate automatically in the Excel version.
  • Signature lines — employee signature and supervisor approval, so the sheet stands up as a payroll record.

How to use it

  • Print a copy per worker per week, or share the Excel file.
  • Have workers record times daily — end-of-week recollection is where most timesheet errors come from.
  • Enter break time in minutes and keep overtime in its own column so payroll can apply the right rate.
  • Have a supervisor sign before the sheet goes to payroll. In most provinces you must keep time records for several years — file them.

The honest limitation of any paper timesheet

A template fixes the format, but not the process: sheets still get filled in from memory on Friday, still get lost in trucks, and still have to be re-typed into payroll. And nothing on paper tells you whether the hours were worked on site.

That's the problem JobSnap exists to solve — workers punch in from their phone, every punch is GPS-verified against the jobsite, and the timesheet writes itself as the week happens. If this template saves you time, the app will save you more.

Try JobSnap free for 30 days

$5 per employee per month, $20 minimum. Every feature included. No credit card to start.