JobSnap vs Raken: Daily Reports and Crew Time for Contractors

Raken started from the construction daily report and grew into time cards and project paperwork for general contractors. JobSnap started from the GPS time clock and added daily reports on top of the hours. If you are weighing JobSnap vs Raken, both put the foreman's day on a phone. The difference is how much project management you want around that report, and how your company is billed for it.

Competitor information is based on publicly available material and may change. Always confirm details and current pricing on the vendor's own site. We've tried to be fair: both products below are capable tools, and the right choice depends on your business.

JobSnap Raken
Pricing structure $5 per active employee per month, $20 minimum. One plan, every feature included. Per user, billed annually, with a minimum number of users. Two published plans plus custom pricing for larger teams.
Daily report contents Three short questions you can edit, your own fields, the day's weather, and labour and equipment hours pulled from the timesheet. Weather, manpower, work logs, notes and photos.
Report delivery Optional due time, and a daily email summary to the people you choose. Automated email notifications.
Time tracking Included. Automatic clock in and out at the jobsite boundary; foremen can clock in a whole crew. Time cards need the Performance plan, and Raken sells a Time Clock add-on on top of it. Basic has work logs only.
Shared time clock Kiosk mode on any phone or tablet, included in the same price. Leaving it takes the manager's sign-in. Kiosk on the Performance plan.
Location checks Geofence per jobsite; punches outside it are recorded and flagged for review. Project radius geofencing and flags for workers who leave while clocked in.
Languages English and French. English; workers can switch the time clock to Spanish. Check with the vendor for French.

Two kinds of daily report

A Raken daily report is a project document. On a commercial job with a general contractor, five subs and an owner's rep, it collects everyone's manpower, notes and photos into one signed PDF that the office can file and send. That is the report a superintendent needs when the schedule is disputed months later.

A JobSnap daily report is shorter. The person who ran the job answers what got done, what caused delays or extra work, and what is needed tomorrow. The labour and machine hours are already filled in from the timesheet, so the foreman does not count heads at 4:30. For a crew of six on a driveway, a roof or a foundation, that is usually all the owner wants in the inbox.

Who Raken suits

  • General contractors on commercial projects. A GC coordinating many subs and an owner's rep on the same job is the customer Raken's reporting is built around.
  • Offices already on Procore, Sage or Viewpoint. Raken lists direct integrations with those systems, so it slots into software you have already paid for and trained people on.

Where JobSnap fits

  • You want the time clock without a plan upgrade. In JobSnap, geofenced punches, timesheets and daily reports are all in the same $5 per active employee price, $20 minimum.
  • The crew shares one device. Switch a tablet at the trailer or a phone in the gang box into kiosk mode and the whole crew clocks in and out on it. Workers can't wander into the rest of the app, and there is no extra seat or hardware to buy.
  • You schedule crews, not just projects. The crew whiteboard and planner show who goes where next week, with time off.
  • Your crew works in French. JobSnap runs in French and English on iOS, Android and the web.

How to decide

Ask who reads your daily report. If it goes to a general contractor or an owner's rep, and it has to carry other companies' crews, look hard at Raken. If it goes to you, and the hours behind it matter as much as the words, JobSnap covers it at one price. Raken offers a demo and a trial for new accounts. JobSnap has a 30-day free trial with no credit card, and a live demo you can open today.

Try JobSnap free for 30 days

$5 per employee per month, $20 minimum. Every feature included. No credit card to start.